meishengchao member offline |
|
posts: |
157 |
joined: |
07/29/2015 |
from: |
shanghai, DC China |
|
|
|
|
|
Note floors against moisture |
He entered the rainy season. Air humidity is quite large, people feel sweltering, poor breathing. However, the house is being renovated for people who worry more than that.Outdoor pavilion Waterproof paint parts: the basic principles of the rainy season is not the painting. First, wood products, due to the rain humidity, moisture heavy, if the woodwork painting, water vapor can easily be wrapped inside, wood surface will be cloudy or white, followed by painting the walls, the consequences are more serious, since to putty before painting Usually, if the walls have water vapor, will cause cracks and other phenomena. Buy materials * Anti-rain: If you choose to buy a plate on a rainy day, you must pay attention to prevent rain. In particular, some of the material is easy to absorb moisture, such as wood, gypsum board and the like. During transport if they are wet in the rain, surface water tends to remain, with high humidity in the air, can easily result in material deformation. · Moisture proof flooring: the rainy season is generally not recommended flooring, mainly because of the underground moisture can not be volatile, if the keel moisture content is too high, it is likely to cause moisture reserving. Once the winter, after the floor of the water is absorbed by the dry air, likely to cause deformation of the floor or increase the gap.Outdoor wood patio fence It is not the rainy season means that it must be shut down? of course not. Because many families will start at the beginning and decoration company signed a contract agreed period, so no one was willing to bear the risk of default. In fact, the rainy season decoration, as long as attention to moisture interference renovation works, some projects can be carried out, such as the laying of wires, do Door window cover, and laying laminate flooring and the like. This is to avoid the weaknesses of the rainy season decoration, but also can be completed on time in accordance with the contract, the truly clever renovation process of the rainy season.boat flooring
|
|
|
|
|
|