go to  ForumEasy.com   
The Sports Hub  
 
 
   Home  |  MyForum  |  FAQ  |  Archive    You are not logged in. [Login] or [Register]  
Forum Home » High School Football » Construction details of solid wood to heat the floor installation What?
Email To Friend  |   Set Alert To This Topic Rewarding Points Availabe: 0 (What's this) New Topic  |   Post Reply
Author Topic: Construction details of solid wood to heat the floor installation What?
meishengchao
member
offline   
 
posts: 157
joined: 07/29/2015
from: shanghai, DC
China
  posted on: 04/08/2016 02:22:05 AM    Edit  |   Quote  |   Report 
Construction details of solid wood to heat the floor installation What?
Construction details of solid wood to heat the floor installation What?
Construction details of solid wood to heat the floor installation What? What issues need attention during the installation of solid wood to heat the floor? Ground handling, ground in a two-meter radius of the range must be level, height difference should not exceed 3mm. Ground to be completely dry before laying of the floor must be geothermal heating test, the water temperature of at least 50 ℃, to ensure that the heating system is operating properly. And incubated to 24 hours or more, so that the ground is dry, the moisture content to ensure compliance with standards.
Installation process, radiant heating flooring installation
Methods: the laying of the keel, suspension laying method, paste laying method.
Keel laying method and installation elements Concierge Conditions, the keel laying method should pay attention to the following aspects:
(1) for low temperature hot water heating system, the heating pipes should be laid between the keel insulation board insulation layer, to facilitate the protection of the heating pipe. Heating cable for floor radiation heating of the heating cable has more stringent requirements. In accordance with the installation experience, and on the use of wood keel when installed floor heating cable power line should not be greater than 10W / m.
(2) floor keel
Fixed in a horizontal layer filling layer, not fixed wedge fixation, glue or cement can be fixed.
(3) the thickness of the cover layer is not too thick, and set up camp joints. If the heating pipes pass through expansion joints, it should be located not less than the length of the flexible sleeve 100mm.
(4) Regardless of the laying method is used, the cover layer (horizontal layers and fill layers) and the flatness of the floor general requirements, as should be up to 2mm / 2m.
(5) covering the level of moisture content ≤ local equilibrium moisture content.
Related Article links:
 

home improvement bench slats

price difference between engineered Wood and pvc decks

decking material options waterproof


 Profile | Reply Points Earned: 0

 
Powered by ForumEasy © 2003-2005, All Rights Reserved. | Privacy Policy | Terms of Use
 
Get your own forum today. It's easy and free.